The second phase of Jam – Asalouye petrochemical cooling water line replacement project

Jam Petrochemical Cooling Water Line Replacement Project Information

Additional details of the project of replacing Jam petrochemical cooling water lines

With the benefit of experienced and expert industrial contractors team, as well as having capable teams in the implementation of industrial projects, supplying industrial equipment and deploying light and heavy machinery, following up on all executive operations and the progress of the second phase of the project of replacing the cooling water lines from GRP to Carbon steel has been put on its agenda in the form of a 4-month intensive schedule.

The second phase of Jam Petrochemical cooling water lines replacement project, following the successful implementation and operation of the first phase of this project, was handed over to this company by the industrial contractors of Jam Sanatkaran Company in August 2019.

Jam Sanatkaran Company, by using all its capabilities, including the knowledge and skills of technical and operational experts, as well as the use of machinery and industrial equipment, is trying to implement operations in the shortest possible time and at the appointed time, starting with the construction of the Jam Petrochemical Complex, the project. The replacement of the cooling water lines of this complex will be completed.

The aim of the project of replacing Jam petrochemical cooling water lines

The operation of replacing the cooling water lines of the downstream units of Jam Petrochemical Complex from GRP to carbon steel (including all civil and piping operations) in order to eliminate the risk of repeated breakages of GRP lines and damages caused by stopping the production of the relevant units.

Specifications and workload of the project of replacing Jam petrochemical cooling water lines

  • Demolition and excavation operations: 35,000 cubic meters

  • Reinforcement operation: 485,000 kg

  • Molding operation: 10,000 square meters

  • Concrete pouring operation: 5,600 cubic meters

  • Piping operation: 39,000 inch-diameter

Features and strengths of the project of replacing Jam petrochemical cooling water lines

  • Optimum financing and supply of manpower, equipment and industrial machinery and other resources required by the project according to the forecasts made.
  • Carrying out the executive operation of replacing the cooling water lines while all the production industrial units of Jam Petrochemical Complex are active
  • Cost control and industrial project management according to budgeting
  • Realization of all dimensions and qualitative and quantitative indicators expected in the cooling water line replacement project

    On-time execution of the cooling water line replacement project despite the complexities of execution and the considerable compression of the schedule.

  • Using and applying efficient principles and standards in industrial project management

The services provided in the project of replacing Jam Petrochemical cooling water lines

  • Industrial equipment supply

  • Timing of light and heavy machinery

  • Restaurant construction and development materials

  • Provision of human resources for project implementation